Sunday, November 1, 2015

Repeated Drilling Waste Management System from Russia


It is always being good to have repeated orders from client, this means a lot. Just as our own normal decisions, if we are not happy with some products, we will switch to another one. There are too many choices, this is the third Drilling Waste Management System for this same client. As we know, Russia drilling operation normally under very cold weather, this need the equipment to specially designed for cold temperature.
The Main Equipment for this project include following:
1) One Containerized Vertical cuttings Dryer system with winterization
2) 3 Screw Conveyor, two for feeding the cuttings dryer, one for discharge drilling cuttings from the dryer.
3) Two sets decanter centrifuge with one VFD and one fixed speed. Those two decanter centrifuge is on the solids control tank, but they are for handling thedrilling mud from solids control tank as well as the drilling fluids discharged from the cuttings dryer.
4) 3 screw pumps, one for cuttings dryer flushing, the other two for feeding the centrifuges.
So except lower down the price, this is how we survive in the horrible time. Can not say we have how many fans, but GN Solids Control  now already have a lot of clients support, with their advise, with their sticking to GN brand, GN is getting better and better now.


No comments:

Post a Comment