Sunday, January 31, 2016

Welcome to meet with GN in CIPPE at booth E2200

With a nice begining of 2016, welcome to pay a visit to GN in CIPPE, snabel-a booth E2200. Details seeing that below:
Address: New The far east International Exhibition Center, Beijing; No . 88, Yuxiang Route, Tianzhu, Shunyi District, Beijing
Event Time: March 29-31, 2016
GN Booth Number: HALL E2 -E2200, presentation area area 272m2.
Booth Area: http://public.cippe.com.cn/static/hall/2016bj/hall_e2.jpg
Appointment Email: sales@gnsolidscontrol. com
GN Factory Place: 40KM to the Exhibition Centre (40 Minutes Drive)
Along with prediction on the market development, GN have made several big actions before other solids control suppliers. No matter GN is often a leader on this or not, GN have been the first, the leader for a lot of things. Been the initial API certified company, the 1st solids control supplier possess office & wearhouse with Houston, the first one have competent verticle cuttings dryer intended for waste mangament, the first one supply by china manufacturer who supplied waste management equipment to Baker Barnes. Also if only comparing the marketplace for oversea from China, GN must be the biggest one. Right after exported to over 60 nations, have been known by a lot more customers, engineers, and getting worldwide reputation.


Before men and women told us that we researched, and found you, then currently all new customers told us all, we are recommended by many reliable engineers, friends.
This is visit GN booth as well as check the products by yourself. Discovering is beliving, that is anything you always say, as easy to discover the production capacity, and if a number of manufacuturer is ready for your own order, for big orders not really. The facility is good or ready enough for production acturate equipment, suppliers great / qualified enough with regard to higher tech equipment.
In conclusion, Meet with GN people, and pay attention to the reason you can work with GN.

Monday, January 25, 2016

Cost-effective Shale Shaker Screen for Sale 20-30% Off

Shaker Screen is among the very often uses wear areas for drilling process. While starting the drilling method, the shaker screen will be installed on the shale shaker unit to separate the reliable particles in drilling water. The fine holes in screen panel could mass the solids larger than the opening size, while the liquid could possibly go through easily. On olive oil field, most of the shale shaker unit is using 3 or 4 panel screens. According to different condition of the actual drilling fluids and utilization, the driller need generate inventory of the spare shaker screen.
It will be good to obtain the shale shaker screen from the first shale shaker supplier once are willing to spend much cash on it. There is another way to find the replacement screen from the OEC screen manufacturer. This would spend less a lot on the cost of save screens, so that the drilling price would be greatly reduced.
GN Solids Control, definitely, is one of the companies of the shaker screens. Having nearly 10 years experience that manufactures the solids control gear and shaker screens, GN now could provide the substitution shaker screen for Derrick FLC 500 and 48-30 series, replacement screen intended for Swaco Mongoose and ALC series. No matter hook deprive or frame type, pre-tensioned or non-pretensioned. Many beneficial onsite level performance reactions proved the GN’s screen quality.


It is well known GN is a manufacturer who is maintaining improving the technology. Right after several years’ research in addition to kindly feedbacks from client, GN has improved typically the technology on shaker screen fabrication, which greatly enhances the shaker screen life time and minimize the processing cost. This kind of directly leads to the decrease of the screen price. GN is willing to share the power with all the clients by offered the full line screens using a 20-30% unit price lowering. That is really good news for your shaker screen requester.
GN is also able to provide the alternative shaker screen used on Cobra shaker, VSM300 shaker as well as FSI shakers. Besides, GN’s does have the screens with regard to own shale shaker product. If you have any request within the shaker screen, just contact us to get more information.

Sunday, January 17, 2016

Cycle of cleaning for the drilling fluid

Concept: The cleaning cycle of drilling fluid is to remove the harmful solid debris, reserve the clean drilling fluid to meet the demand of drilling fluid spec under the drilling process. Drilling fluid cleaning system is the term of all drilling fluid solids control equipments used in the oil drilling.

Function: To prevent the oil well from clogging, breaking, and decrease the drilling torque and friction resistance, reduce the pressure fluctuations of the empty suction, increase the drilling speed, extend the drilling bit life of use, and reduce wear and tear of the equipments.
Methods: The usual methods are mixture-thin methods, swap methods, machine methods and additive-chemical methods. Use different separation function machinery is  machine method is by using screening, centrifugal separation and gravity separation to separate the solid phase according to the different size and density, therefore, to control the solid phase in the drilling fluid.

1 The technical process of the drilling fluid cleaning system and the combination of the fluid cleaning equipment.
The technical process of complete group of drilling fluid cleaning system should meet the specification of five level solid phase control (screening, degassing, desanding, desilting, centrifuge) and the provoke the drilling fluid. The merger of each solids control equipment is very important, the through out of one to five level of mud cleaning equipment should each work with each other, and the spacing of the proper distance were is appropriate.  To have certain repeating cleaning during the cleaning process, make the smaller particles of the processing incomplete in the up one had been disposed in the next solids control equipment.


2 Drilling fluid cleaning cycles

The mud back from the opening of well through the pipeline and conveyed the drilling fluid to the shale shaker. The first phase of cleaning completed by shale shaker, then entered the mud tank, the drilling fluid flowed from the mud tank through the tank slot into the desander and desilter (if detect the present of gas, vacuum degasser will process to remove the gas) the fluid after processing of the centrifugal steps and through the tank slot enters the inhalation cabin.  The cleaned fluid then will reuse for lubricate and cooling the drill bit. 

Sunday, January 3, 2016

GN Closed Loop Zero Release System

As the restrictions with regard to dispose the drilling waste material from the oil and gas drilling is now more and more strict all over the world, particularly in developed countries and regions, the drilling companies as well as the oil related service businesses are more and more careful in disconnection with the drilling waste. It may be a trend that so-called zero discharged solutions is required for the oil and gas drilling market.
Among all the solids control and waste management producers in China, GN Solids Control is the first to create and develop the zero-discharged closed loop for treating the actual drilling cuttings. See specifics as below:
1 . GN complete solids control system including GN shale shaker, GN mud cleaner, GN middle speed decanter centrifuge and GN high speed decanter centrifuge. all drilling cuttings discharged from above mentioned products are collected by GNSC series screw conveyor for even more treatment instead of disposed.


installment payments on your GN drilling cuttings squander management system, it is useful for further treat the drilling cuttings. because the drilling cuttings from the solids control system are still wet. This system includes GNZS594HGE-LD drying shakers and GNLW363CG high speed decanter centrifuge for WBM solely. Or, GNCD930C vertical cuttings dryer and GNLW363CG Decanter centrifuge for both WBM and OBM.
The above mentioned two systems are enough for the majority of cases.
3. GN Dewatering unit and high speed dewatering centrifuge GNLW363CG-VFD. Dewatering product is a system for foloculating the extra fine particles in to larger ones in order to be connectors by the high speed decanter centrifuge. Like the item 2 is approximately the further treating with regard to drilling cuttings, the dewatering unit is for further healing the liquid.
4. GN Solidification unit and TDU Unit are respectively utilized for finally dispose the very well dried drilling cuttings in the drilling cuttings waste management system.