The installation of solids control
drilling mud recycle system to meet the oil well drilling requirement in
different stage of well drilling. The drilling fluid tanks mixer, butterfly
valves need to be easy to use.
Base on the provisions of the
garbage pit dug well, the size of garbage pit cannot be smaller than
requirements of the design.
To make sure the safety of
operators, it needs adjusting calibration of rotation direction of the motors
that connected to the spindle flange ring. The start use of desander and desilter,
and the drilling fluid decanter
centrifuge before pre-heating of steam pumps and the pipelines.
The circulation of the drilling
fluid, it reserves and distribution system work of insulation.
The ground measurement,
maintenance and the handling to ensure the stability of performance of drilling
fluid is base on strict implementation of the design of drilling fluid program
that strengthen the daily management of the drilling fluid.
The slurry and bentonite must be
pre-hydration of 24 hours.
The filtrate loss reducer and
plugging agent to add amount to be enough to maintain the stability of the
borehole by increase the drilling fluid input.
The personals that work on
drilling mud
system need to be increase compare with the drilling operation in
the summer time by use mud scraper, blowout prevention box to reduce the waste.
Make sure strengthen the drilling
fluid material reserves and management works, the reserves should be sufficient
to prepare more than 50 cubic meters of drilling fluid.
The timely manner to remove the
drilling cuttings in both desander and desilter cones to make
sure that the conical tank liquid discharge port clearance.
To complete testing variety of
drilling fluid equipments ensure ease of use for drilling mud recycling system operators.
No comments:
Post a Comment