Mud tanks are the base of a drilling mud system, regardless of oil and gas drilling mud
solids control systems, or HDD or CBM or TBM, or whatever. When there's drilling and there mud can be
used, it's important to possess mud tanks.
It's not a difficult job for an engineer to
create a mud tank using the modern
soft-wares like AutoCAD or three dimensional drawing tools, but exactly how to
assist the client to obtain an ideal tank in the beginning time? May be the
asked for storage capacity of tank enough for design? GN Solids Control shares
some suggestions.
1. When the first is requesting a solids
control system for oil and gas drilling, this means the drilling mud comes from
the well hole directly. Within this situation, we have to consider the weir
height of shale shaker when selecting the
peak of mud tanks. If the entire height of shaker weir and tank height is
simply too large, it's possible that the mud can't fall in the pipelines from
well mouth. This tip is particularly for workover rigs. For meeting customers’
different demands, GN has designed its shale shakers to supply several optional
weir types.
2. Throughout transportation, what
equipment within this system might be taken apart, while which equipment has to
be fixed on tank and moved together? Actually, mud agitators will always be on mud tank, while shale shakers
and mud cleansers will always be removed temporary.
3. Can there be any legal requirement in
the users’ local for that biggest width or biggest height? This should be taken
care.
4. just in case of worldwide business, the
machine have to be shipped by ocean. What type of ocean shipment will the
consumer accept?
Obviously, the storage capacity can be the
fundamental requirement which needs to be meeting in the beginning stage. GN
always believes to supply the clients with best and appropriate solution.
Related Arciels:- Shear pump basics
- Mud Gun & Mud Gun Pipeline in Solids Control System
- The choice of drilling fluid shaker screen
- Hydrocyclone Installation
- GN solids control company