Tuesday, May 10, 2016

GN Mud Cleaner

The correct installation and use of hydrocyclone mud cleaner can filter unwanted solids from the mud to achieve controlled velocity.  It is important to use mud cleaner properly to ensure the quality of treated drilling mud
.

1.       The correct position of hydrocyclone mud cleaner for whole mud mixing system is behind shale shaker which filter large solids at first step.
2.       The drilling mud prior enter the hydrocyclone must be processed through shale shaker first.
3.       Check the power source and once motor is start, check direction of rotation of the motor rotate in correct direction.
4.       Seeking unusual noise from motors after turn on the machine
5.       Secure the screen and hand feel the strength of the screen.  Initiate the test-run fluid and check if screens are intact.  Check every moving parts while machine is on
6.       Clean the screen by end of each shift to prevent blockage of mesh and extend the usage life of screen
7.       Stop the feeding of mud should turn off the pump first and keep on the shale shaker for another few minute and wash the screen, then shut down the shale shaker
8.       Re-grease the bearing as needed for proper moving on machine parts
9.       When the feed liquid pressure equal to the rated pressure, turn off the valve on the overflow tube, make the tubular value of the overflow pipe is 0.01-0.03mpa. When the feed pressure below the rated pressure, adjust the valve on the over-flow, make the tubular value of the overflow pipe is .0.02-0.05mpa.
10.    For every 500 operation hours, the machines need regulator maintenances by checking moving parts and replace parts as necessary.

11.    For every 4000 operation hours, the machine needs overhaul by doing maintenance list above and replace the hydrocyclone and check that insulation of electrical parts of the machine.

Wednesday, April 6, 2016

How you can Order Mud System from GN Solids Control

GN Solids Control is known as a producer and supplier of drilling mud system, not only the person equipment. Some customers really have mud tanks ; they only need order the gear like shale shaker along with centrifuge units. While some some other clients will require the complete mud system including the mud tanks and also necessary tank attachments. And then, how to order mud System from GN?
When shoppers come to GN for a quotation on complete mud mixing system , GN’s sales will ask number of questions as below:
What kind drilling the mud system used for?
What are the Rig sort, power and model?
Exactly how deep you will drill?
Very best required flow rate or perhaps treating capacity of the mud system?
Where is the computer location?
……


Some purchaser may feel boring to discover so many questions. Please be affected person, all GN’s sales company representative are trained to get up to information from customer through different questions. The purpose is always to give the best proposal in order to customers. If you are a mud manufacture, you know well on the mud system, you may understand effortlessly that all the questions expected by GN are vital on making the proposal. And when unfortunately, you are a new one to obtain a mud system, you will really feel it is complicated to buy a mud system. Fortunately, so long as you solved all the questions, then GN solids control may provide a suitable solution to suit your needs.

On the other hand, GN does have normal configuration of mud system for customers to choose.
In regards to necessary oil gas drilling rig, GN has mud systems to get rig from 350HP to be able to 2000HP. Here the HORSEPOWER means the power of the computer winch. And for the mud cleaning systems used in HDD plans, GN design ranges via 200GPM to 1500GPM, sleek and stylish structure and self-contained. GN also has economic mud recycling where possible unit for water effectively drilling, piling and TBM projects. All these mud system could be designed standard and also customized.
If you have the request for a mud system but you seldom know how to order a suitable 1, just contact with GN Solids Control as every sales dude in GN are good on guiding customer to find what exactly they are looking for.

Saturday, April 2, 2016

4-tank mud system for 750hp drilling computer

GN Solids Control is really a worldwide famous brand of mud solids control system, drilling waste management system, and also replacement shaker screens.

Soon, GN Solids Control Cina factory finished a mud system for a domestic job. It is a 4-tank mud system for 750hp drilling rigs.
1) The 4 mud tanks of the 750hp drilling mud system are the same sizing with 40ft container. And also the tanks are equipped with 3-runner oilfield skid. The oilfield skid is with 250mm at each tank ends. It makes the aquariums easy to movement at jobsites.
2) GN Solids Control equips 2 sets Solids control linear motion shale shaker separator for the system. The system is equipped with only two each 3-panel shale shaker, model GNZS703E. It is the hottest shaker models for coal and oil mud system from GN Solids Control.


3) Within this system, the clients pick 1 desander separator plus a desiler separator.
The desander model is GNZJ752-2S. Its equipped with 2 ea 10’’ desander cone. Each 10’’ desander cone is with greatest extent. 120 m3/h (528GPM) managing capacity.
The desilter cone model is GNZJ752-12N. It truly is equipped with 12 ea 4’’ desilter cone. Each 4’’ desilter cone is with utmost. 20 m3/h (88GPM) managing capacity. For totally 16 ea 4’’ desilter cone, the desilter handling ability can reach to 240m3/h (1056GPM).
4) The 4-tank mud system is equipped with some sort of middle speed
decanter centrifuge to recovery the barite and reduces the mud weight. The centrifuge product is GNLW452. It is a the majority of cost-effective big bowl decanter centrifuge widely used in solids control mud systems intended for oil rigs.
5) As well as many
mud agitators, mud guns, lights, and sends for the system.
6) This kind of clients choose a separate plane
mud mixing system. Typically the jet mud mixing hopper and mixing pump along with control panel are all attached in a separate oil discipline design skid. It is easy to shift it and work to several mud tank systems.

Friday, April 1, 2016

GN 500GPM Mud System used in Middle Eastern for Water Injection Effectively Drilling

Many customers through Middle East coming to GN asking for the drilling mud system used in water well going. Some of these are used for civil normal water wells, while some of them are utilized in oilfield water injection effectively drilling. For some oil water wells with large content regarding natural gas in oil coating or at the later time period of extraction, the oil member of staff always inject water into your oil well to keep a comfortable pressure of the oil level to ensure the oil production pace.
One of GN’s customers through Middle East sent back the photos of GN’s 500GPM mud system on their site. Many people just finished the ordering of this unit and great remarks were given to GN. Different from the mud cleaning system for oil drilling, this particular water well mud system is designed compact structure in order that it could be put on a trailer home for easy moving \.


Below specifications of this h2o injection well drilling mud system
1 . GN 3-Panel screens shale shaker to get first stage solids spliting up, with screen area of installment payments on your 6 square meters, is employed to remove the coarse drillingcuttings.
2 . De-sander, de-silter and under located machine drying shaker composited 3-in-1 mud cleaner unit for orange sand and silt separation. Cyclone unit are full PU material, the quantities regarding 10 inch de-sander along with 4 inch de-silter cyclone are respectively 1 in addition to 8.
3. Three model centrifugal pumps are equipped with 50HP electric motors. 2 are used to transfer drilling mud to cyclone unit, even though the third one is for mud mixing hopper. To highly recommend same model pump will make it easier for potential customer’s maintenance.
4. This specific unit also has independent tank compartment for mud mixing and storage.
5. Entire power requested to run this particular 500GPM drilling mud system will be 126KW, the user could adjustable rate mortgage the engine accordingly while below pictures showing. Purchaser locally got the serp and put it on the trailer home as the power source of often the mud system.
In addition to waters injection well drilling, this manner compact mud system could also be used in HDD (Horizontal Online Drilling). For this type going, the driller need shift the used drilling mud to the mud cleaning system. Similar to the picture showing, the shale shaker is connected with any submersible slurry pump that'll be installed in mud ditch to do this job.

Wednesday, March 30, 2016

Oilfield Water well drilling mud recycling system

Oilfield companies sometimes have such needs for water well drilling for their Eagleford shale project. We do not provide water well drilling service, but we provide mud cleaning/ recycling system for the water well drilling for environmental friendly purpose and reduce the drilling waste.
Recently we finished commissioning for water well drilling mud recycling system in middle east. After the commissioning is finished successfully, they repeat order for the same configuration mud cleaning system for another 2 units. This is not the first unit mud cleaning system they had purchased, 1 set of 200gpm trailer mounted mud cleaning system has been shipped to them in 2014.

The 500gpm mud recycling system is customized design according to the client’s requirement,1 unit of shale shaker, 1 units of desilter cone with mud cleaner, the mud tank with 38m3 storage capacity. Mud mixing hopper is installed on the tank skid at one side, together with the feeding pump of the mud cleaner. The painting color is also customized, they put the skid mounted mud recycling system on the trailer for convenient transportation.
GN standard 500 mud recycling system including the model below:
GNMS-500D( 2 phase cleaning, economic mud cleaning system without mud mixing unit and mud storage capacity, main feature: smart footprint, cheap price, easy movement)
GNMS-500B( 2 phase cleaning, with mud mixing system and 9.5m3 effective tank volume for storage, can be loaded by standard 40 ft container)
GNMS-500G ( 3 phase cleaning with mud mixing unit and 15.5m3 effective tank storage capacity, can’t be loaded by standard 40ft container, width same with 40ft container)
GNMS-500GL(3 phase cleaning with mud mixing unit and 24.5m3 effective tank storage capacity, can’t be loaded by standard 40ft container, dimension same with 40ft container)

To know the difference in configuration between the models above, pls contact GN sales. 

Wednesday, March 23, 2016

GN Solids Control Share Centrifuges for sell

Even in the down-time of oil drilling business, we want to give the best cost and fast delivery in order to client. And we stock regarding 60 sets high speed decanter centrifuge to satisfy the one yr needs for domestic marketplace and overseas market. The actual decanter centrifuge is 14inch dish centrifuge, can be used for each solids control project as well as waste management project. The centrifuge is with certificate; both may be used for onshore drilling task and offshore drilling task. If you have some urgent task, pls contact us freely to obtain reliable product in short shipping time.

14inch decanter centrifuge- GNLW363C main technical specs
1) The centrifuge is the same as US brand centrifuge, we now have many client formerly utilize US brand centrifuges, great they like GN centrifuge because of the high cost-effective items.
2) The centrifuge is by using highest configuration and greatest material for long as well as reliable service.
3) Dish Cylindrical and Conical area made from Duplex Stainless Steel 2205 by centrifugal casting, that is much better than SS304 or SS316.
4) Other Parts of the dish assembly material: stainless steel SS316L. These parts no need SS2205.
5) Screw protection kind: Tungsten Carbide Tiles with regard to longer life and simpler replacement. The price of this component is also very good, make it far easier for clients.
6) Mess flow distribution port as well as bowl solids discharge slot protected by tungsten carbide alloy. This idea is comparable as the screw protection, dependable and lower cost.
7) Dish assembly supported by tighten seat belt for protection of having in moving. This is very important, we now have many cases in past encounter that the bowl damaged due to transportation and delay the actual client’s project. But now, this can not happen.
8) Pressurized EX LOVER proof control panel the actual centrifuge can be used in warm areas, much reliable compared to flame proof type control panel.
Except for 14inch dish centrifuge, we also have some other type for choice, GNLW223 baby centrifuge, GNLW452 18inch centrifuge, GNLW453 18inch high-speed centrifuge, GNLW553 big dish big capacity centrifuge.
Some other solids control equipment: shale shaker , mud cleaner, mud agitator, shear pump, mud gun, mess pump, vertical cuttings dryer, screw conveyor etc .

Tuesday, March 15, 2016

Dry Location Mud System

Offshore and onshore rigs walking water bsaed programs where there are restricted or zero-discharge ideas, the place there may be a scarcity of water, and or the situation it is significant to drill with a low-density or delicate water approach. Colloidal-size particles assemble up inside the fluid procedure, reqruie dilution which cna create immoderate fluid volumes. 
It's a be aware of undeniable undeniable fact that the presence of colloidal dimension particles can degrade the effectivity of water situated driling fluids, requiring high-priced dilution to keep the compatible density and rheological residences. This in flip end result in higher  volumens of waste which have obtained to be handled and sent for disposal.
The portable containerized dewatering procedures can do away with these sufficient particles by means of a procedure of chemically extra compatible centrifugation that is signivicatntly further mighty and low cost than a immoderate percent centrifuge on my own. This offers operators a robust software for maintaining excellent drilling fluid residences. While minimizing drilling fluid waste and lowering cleanup, remedy, and disposal bills. A few designs of dewatering units are availbe to go well with any onshore or offshore rig requirement.The main progress can divided to parts:
1. Dilution 
For some projects, fluids are extremely high contents of fine solids, also no other easy ways to do this quickly, then dilution is one. Old fasion, but quick, easy, sometimes, the most important thing is, it works.
2. Coagulation
When we have a dewatering unit container, normamly coagulation and flocculation unit are included, and normally at higher concentrations, the inorganic salts can form large precipitates, called sweep flocs. 
3. Flocculation
This is a more commen progress in all the separation works. The polymer forms bridges between the coagulated particles, and enabling them to physically join together into larger porous three dimensional structures known as floc.
4. Centrifugation
The final step is done by decanter centrifuge. Where finally the solids are separated.


Hebei GN Solids Control Co., Ltd is leading manufacturer for drilling mud solids control & drilling waste management equipment and shaker screens of shale shaker. Besides as the top one in solids control field for oil and gas drilling, Hebei GN Solids Control Co., Ltd is also the top one in mud cleaning system and mud recycling systems for Bored Piling, Horizontal Directional Drilling, Tunneling and so on. Take GN 500 gpm mud system as an example, GN has 4 standard models with different equipment for different kinds of drilling activities.