Showing posts with label Shaker screen. Show all posts
Showing posts with label Shaker screen. Show all posts

Tuesday, May 10, 2016

GN Mud Cleaner

The correct installation and use of hydrocyclone mud cleaner can filter unwanted solids from the mud to achieve controlled velocity.  It is important to use mud cleaner properly to ensure the quality of treated drilling mud
.

1.       The correct position of hydrocyclone mud cleaner for whole mud mixing system is behind shale shaker which filter large solids at first step.
2.       The drilling mud prior enter the hydrocyclone must be processed through shale shaker first.
3.       Check the power source and once motor is start, check direction of rotation of the motor rotate in correct direction.
4.       Seeking unusual noise from motors after turn on the machine
5.       Secure the screen and hand feel the strength of the screen.  Initiate the test-run fluid and check if screens are intact.  Check every moving parts while machine is on
6.       Clean the screen by end of each shift to prevent blockage of mesh and extend the usage life of screen
7.       Stop the feeding of mud should turn off the pump first and keep on the shale shaker for another few minute and wash the screen, then shut down the shale shaker
8.       Re-grease the bearing as needed for proper moving on machine parts
9.       When the feed liquid pressure equal to the rated pressure, turn off the valve on the overflow tube, make the tubular value of the overflow pipe is 0.01-0.03mpa. When the feed pressure below the rated pressure, adjust the valve on the over-flow, make the tubular value of the overflow pipe is .0.02-0.05mpa.
10.    For every 500 operation hours, the machines need regulator maintenances by checking moving parts and replace parts as necessary.

11.    For every 4000 operation hours, the machine needs overhaul by doing maintenance list above and replace the hydrocyclone and check that insulation of electrical parts of the machine.

Tuesday, March 1, 2016

Mud Cleaning system for oil drilling progect

GN Solids Control produce all of the solids control products, eg. Shale shaker, desander, desilter, mud cleaner, decanter centrifuge, agitator, etc . GN several phase solids control mud system is working in more than 60 countries and locations with good working efficiency and reliable lifetime.

GN Solids Control four period mud recycling system which includes below parts.

Part one particular: shale shaker working on mud tanks, as the first cycle mud separation equipment. Looking for different type shale shaker intended for option. Including
a. 3 deck panel shaker that is certainly professional for diamond drilling, or other simple structure project.
b. 3 decks panel shaker which can be intended for workover rig and other task.
c. 4 deck panel shaker which is most popular intended for oil drilling circulation mud system and this can also intended for drilling waste management.

Aspect 2: Desander working following shale shaker to give additional treatment, as the second stage mud cleaning equipment. We also provide different type desanders for solution.
a. desander without terrace shaker, cheaper price.
udemærket. desander with deck shaker, reasonable price with higher efficiency



Part 3: desilter doing work after desander to give even more treatment, as the third level mud cleaning equipment. We in addition have different type desitler for alternative.
a. desilter without veranda shaker, cheaper price
c. desilter with deck shaker, reasonable price and higher efficiency.

Remark: we can also offer mud cleaner which is combination of desander & desilter. Smaller presence, but better performance.

Part several: Decanter centrifuge after desilter to give further treatment, since the fourth phase mud cleaning implement. We have different type centrifuge intended for options.
a. GNLW223 infant mini centrifuge for diamonds drilling
b. GNLW363 centrifuge which is most popular model intended for solids control / drilling waste management, GNLW363 will be replacement for Derrick DE1000 centrifuge, etc .
c. GNLW453 as well as GNLW553 is GN significant bowl big volume centrifuge for special requirements
g. GNLW452 centrifuge is central speed centrifuge which is specialist for barite recovery with regard to oil drilling.

Any needs, pls contact us freely.


Monday, January 25, 2016

Cost-effective Shale Shaker Screen for Sale 20-30% Off

Shaker Screen is among the very often uses wear areas for drilling process. While starting the drilling method, the shaker screen will be installed on the shale shaker unit to separate the reliable particles in drilling water. The fine holes in screen panel could mass the solids larger than the opening size, while the liquid could possibly go through easily. On olive oil field, most of the shale shaker unit is using 3 or 4 panel screens. According to different condition of the actual drilling fluids and utilization, the driller need generate inventory of the spare shaker screen.
It will be good to obtain the shale shaker screen from the first shale shaker supplier once are willing to spend much cash on it. There is another way to find the replacement screen from the OEC screen manufacturer. This would spend less a lot on the cost of save screens, so that the drilling price would be greatly reduced.
GN Solids Control, definitely, is one of the companies of the shaker screens. Having nearly 10 years experience that manufactures the solids control gear and shaker screens, GN now could provide the substitution shaker screen for Derrick FLC 500 and 48-30 series, replacement screen intended for Swaco Mongoose and ALC series. No matter hook deprive or frame type, pre-tensioned or non-pretensioned. Many beneficial onsite level performance reactions proved the GN’s screen quality.


It is well known GN is a manufacturer who is maintaining improving the technology. Right after several years’ research in addition to kindly feedbacks from client, GN has improved typically the technology on shaker screen fabrication, which greatly enhances the shaker screen life time and minimize the processing cost. This kind of directly leads to the decrease of the screen price. GN is willing to share the power with all the clients by offered the full line screens using a 20-30% unit price lowering. That is really good news for your shaker screen requester.
GN is also able to provide the alternative shaker screen used on Cobra shaker, VSM300 shaker as well as FSI shakers. Besides, GN’s does have the screens with regard to own shale shaker product. If you have any request within the shaker screen, just contact us to get more information.

Wednesday, May 20, 2015

GN Solids Control Abroad Market Recent Order

GN Solids Control is top China manufacturer for solids control equipment & drilling cuttings management equipment. Decanter Centrifuge and Vertical cuttings dryer is GN advantage equipment aside from this, we have large sales amount on traditional solids control equipment.


1) GN mud cleaner for India drilling company

Lately, an India customer bought 2 sets of mud cleaner (GNZJ703E-D1S8N) with 1 ea. desander cones & 8 desilter cones. This mud cleaner could be installed after shale shaker to deal with the drilling mud and separate contaminants with the diameter above 20 to 40 microns.

GNZJ703E-D1S8N with 3 panel shaker screen could be transformed to shale shaker usage, just take apart the upside steel frame with desander cones and desilter cones.

2) GN replaceable shaker screen for Derrick shale shaker

GN Solids Control is also able to offer replacement shaker screen for Derrick 500/2000 PMD/PWP shaker. The alternative shaker screen can achieve almost same working performance however with better cost.

Aside from this, GN is also able to offer replaceable shaker screen for Nov Brandt king cobra, Swaco Mongoose etc.

3) GN Shale shaker for Argentina customer

The Argentina customer is GN old customer with stable requirement each year. Some year, they're buying decanter centrifuge for solids control some year, they're buying shale shaker replaceable for Derrick shaker.

GN may also offer 4 panel shakers that are replaceable for Swaco Mongoose composite material shaker.

4) GN Poor boy degasser for South America customer

The South America customer buy 10 sets decanter centrifuge from GN Solids Control in 2011. The performance is excellent. Lately, we receive repeated order in the customer with one poor boy degasser. This really is backup equipment for oil drilling rig site.


This season is nice harvest year for GN Solids Control. Decanter centrifuge with more than 100 teams of sales amount, vertical cuttings dryer with more than 20 sets sales amount, shale shaker & mud cleaner with more than 100 teams of sales amount. GN Solids Control happens to be top direct export company within this area.
Related Arciels:

Tuesday, May 5, 2015

The great growth and development of GN Solids America

This season the gas and oil industry isn't a large harvest year, for the majority of the firms for oil and gas drilling field, they've gone through a complicated whole year. Because of the large aftereffect of political conflicts, the cost of gas and oil is changing. And also the oil has arrived at the underside cost since 5 years ago.

Many solids control or solids separation companies need to cut lower their production to help keep running. So this is actually the time that just these solids control companies with superior quality and good post sales maintenance can survive and even perhaps much better than the past.

GN Solids Control has committed to Houston to determine a United States branch company that is GN Solids America LLC. Frankly speaking, because of the large and complex preparation work on the start of establish of GN Solids America. Our sales in Houston don’t cash time for you to get the American market.

However, GN sales in Houston are spare without trying to grow the gas and oil industries in addition to waste management industry. The other half year, GN Solids America harvest a lot of orders on solids control devices. Many teams of shale shakers, mud cleansers, decanter centrifuges and vertical cuttings dryers in addition to 100s of shaker screens happen to be shipped to Houston warehouse from China factory. Which devices are offered in a brief period?

Many clients have known GN Solids Control for many years, and they're glad to determine GN has one warehouse in Houston, Texas. So after they have this great news, a number of them arrived at GN warehouse directly, they wish to get these devices once they observed the important procedure for them.



Related Arciels:

Wednesday, March 18, 2015

Barite recovery centrifuge system available in Houston warehouse

GN solids control designed barite recovery decanter centrifuge product is welcomed to get ready checked in GN Houston warehouse at 6710 Wind fern road, Houston, Texas 77040.

The configuration of the barite recovery product is as below:

1 GN Hi-G dryer shaker GNZS594E-HB, we've 10 models of these shakers available there, it's a 4-panel pre-tensioned screens shakers with total screens area 2.73 square meters. The part from the shaker would be to separate the large solids and fewer the solids content before feeding towards the decanter centrifuge.

2 GN variable frequency drive decanter centrifuge for barite recovery

Each of GNLW452 and GNLW453VFD decanter centrifuge can be utilized as barite recovery, the most typical model and efficient strategy is GNLW452 decanter centrifuge, if you wish to alter the speed in line with the mud weight, you are able to alter the lever and belt, but it's not convenient to alter the lever, you need to steer clear of the centrifuge, anyway, it's the most economical way.

GNLW453VFD decanter centrifuge is variable frequency drive decanter centrifuge which has big volume and high speed, you are able to alter the speed through the PLC controlled VFD control panel if different mud weight.

Another option is to find 2 models centrifuge, GNLW452 for top gravity centrifuge, GNLW363VFD or GNLW453VFD centrifuge for low gravity centrifuge.

3 jet hopper system


5 Necessary spares, like shaker screens

Also we offer the choices to place the shale shaker, 2 decanter centrifuges on a single mud tank slid, with 2 VFD control panel and jet mud mixer system.


Aside from barite recovery system, we design the entire system for dewatering centrifuge along with solids removal device. For more information relating to this project, please contact GN Solids America. We now have hi-G dryer shaker and VFD decanter centrifuge for test.
Related Arciels:

Friday, December 12, 2014

The problems and solutions about shaker screen

Shaker screen blinding takes place while particles of solids being screened embed in a screen hole. This usually appears while drilling fine sands , for instance, in the Gulf of Mexico. The right after sort order is observed in the course of screen blinding.

1.  When a brand-new screen is set up, the circulation drilling fluid drops through the screen for a short distance.
2.  After a period of time, the fluid endpoint moves to the end of the shale shaker.
3.  In a very short time this happens, the screens are changed to get rid of the fast discharge of drilling mud from the end of the shaker.
4.  Soon after the screens have been washed, fine grains of sand which are lodged on the screen's surface can be discovered. The surface area of the screen will resemble fine sand paper because of the sand particles lodged in the openings.

One common approach to the problem to screen blinding is to change to a finer or coarser screen that the one being blinded. This strategy is effective if the sand which is being drilled has a narrow size distribution. Another method is to change to are rectangular-shaped screen, although rectangular screens can also blind with multiple grains of sand.

Blinding – the “plastering” of a soft material over and in the mesh, rendering it blocked. Remedy wash with high pressure fluid using the base fluid of the drilling fluid. If this fails, fit coarser screens temporarily.
Plugging – the blocking of the mesh by a particle (usually sand)  fitting into the pore throat of the mesh. Remedy - wash with high pressure fluid using the base fluid of the drilling fluid. This is best done from beneath the screen . It is often successful to place a fine screen on to reduce the “near size” plugging.

GN Solids Control Amercia can provide high quality shake screen and other drilling equipment, if you want more information, you can contact us freely.

Thursday, August 21, 2014

Shaker Completes Field Trial in America

Performance Report: GN-3 Triple-Deck Shale Shaker Screen Completes Field Trial in America
Challenge: The GN-3 Shaker underwent a field trial on a major operator land drilling site. The main trial objectives were to test the flow rate handling capacity and make a qualitative assessment of the solids handling and conveyance capacity of the GN-3 Shaker. Shaker screen life was also measured and compared to historical benchmarks.

Solution: The GN-3 Shale Shaker is a multi-deck shaker engineered to provide efficient solid separation. The Shaker Screen was set in a parallel configuration, meaning the bottom decks were running in parallel with each other and using the same mesh (for the majority of the test). For this trial, the GN-3 unit was installed between the shaker cutting tank and the first fluid storage silo. Tests were conducted on 12-8 and 6-in. sections.



The GN-3 unit was rigged up to take 100% of the flow from the bell nipple, with the three rig-owned units on standby, but isolated. The mud system was KPM, a KCl polymer system. 28 gumbo screens with 0.8 x 118 mm openings were used on the scalping deck and the middle and bottom decks were dressed with 84 XR screens. HC screens were later used in the section due to their superior performance in sticky clays. For the first 40 m (131 ft) drilled, the GN-3 unit was able to handle the complete flow rate of 2,500 L/min. At 40 m (131 ft), the screens partially blinded in unconsolidated sands and the total flow rate was reduced to 1,250 to 1,500 L/min. The GN-3 unit was able to handle 750-900 L/min of the total flow (60%). This result was historically better than previous wells, where flow was usually limited to <1,000 L/min in total due to excessive blinding across the three rig shakers. Once into the Breda, Rupel and Asse clay formations the flow rate was increased to 3,000 to 3,100 L.min in total, with the GN-3 unit treating 2,000 to 2,700 L/min (66 to 88% of total flow). Once into the lower Tertiary clays and Upper Cretaceous chalk, the GN-3 unit was able to treat up to 3,400 L/min (100% total flow) with 84/105 (need to specify HC or XR) mesh on the primary decks.
8?-in. section: After a successful cementation of the 9 in. casing and the installation of the BOP the section was started with the GN-3 unit rigged up. The scalping deck was dressed with 38 XL screens, while the middle and bottom decks were dressed with 165 XR and 165 HC screens, respectively. The shoe track was drilled out with the previous KPM water-based mud and then during the drilling out of the cement the well was displaced to 1.25 SG VCM. Once the mud was displaced, drilling of the fresh formation started. The mud system was VCM, a VERSACLEAN LTOBM system. From the beginning of the 8?-in. section the GN-3 unit was able to process the total flow rate from the well. The flow ranged from 1,600 L/min during rotary drilling mode, up to 2,200 L/min while drilling in sliding/steering mode. The GN-3 unit was positioned at the side of the 40 m3 rectangular cutting tank and with 100% of the flow and a dry discharge, the cuttings were stacked in a small area and potentially overflowing the cutting tank. Most of the time the cuttings were manipulated to the sides to keep the shaker running, but at night the third-party cuttings-moving equipment was not available so flow was occasionally switched to the rig shakers to spread the cuttings across the length of the tank.
6-in. section: The 7-in. liner was successfully cemented and BOP pressure-tested. The section was started with the GN-3 unit rigged up. During the drilling out of the cement the mud was weighted up to 1.55 SG. Once the Mud Desilter weight reached 1.55 SG an FIT was performed and drilling continued. The section was terminated early due to well-control problems requiring increasing mud weights, and finally requiring a liner to seal off a high pressure zone. The mud system was VCM., a VERSACLEAN LTOBM system. From the beginning of the 6-in. section, the GN-3 unit was able to process the total flow rate. The flow ranged from 500 L/min up to 900 L/min. The GN-3 unit was positioned at the side of the 40 m3 rectangular cuttings tank with 100% of the flow and a dry discharge; the cuttings were stacked in a small area and potentially overflowing the cutting tank. Most of the time the cuttings were manipulated to the sides to keep the shaker running, but at night the third party cuttings-moving equipment was not available so flow was occasionally switched to the rig shakers to spread the cuttings across the length of the tank.
4 in. section: After the successful running and cementation of 5 x 5 in. liner at a depth of 3,511 m (11,519 ft) the well was displaced to VCM mud with a weight of 1.0 SG. Following a positive flow check and leak off test, drilling ahead was permitted. Drilling ROP was recorded from 1 to 20 m/hr. One bit trip was required and a fresh bit finished the well rapidly at a TD of 3,705 m (12,155 ft). The scalping deck was dressed with 38 XL screens and the middle and bottom decks with 230 HC screens.
The GN-3 unit was able to process the total flow rate. The flow stayed at 500 L/min for the duration with rotary drilling mode as there was no MWD tool in the hole.
The GN-3 Shaker handled approximately 95% of the total fluid flow over the duration of the well. Primary objectives of the test were met or exceeded, including:

No major QHSE concerns under normal rig operations
Flowrate handling capacity was measured at up to 3,400 L/min in the 12?-in. section with 38/84 mesh screens. Capacity was 2,300 L/min in the 8?-in. section with 38/230 to270 screens.
A qualitative assessment of the solid handling and conveyance capacity showed excellent throughput characteristics Shaker screen life was measured and compared with historical benchmarks. The coarser meshes had screen(http://en.wikipedia.org/wiki/Screen) life extending to 120 hr operating, and the finer meshes showed life spans of up to 120 hr in some cases.

GN Solids America(USA) is a company provide Solids Control equipment such as Shale Shaker Screen, Mud Desilter, if you need more information please contact us.